Table of Contents
Surcharge rate
Description
Percentage surcharge for Construction site overheads (BGK), General business costs (AGK), and risk and Profit within the Preliminary calculation.
The overhead rates are determined, for example, within the framework of a cost calculation and are included in the Workspaces deposited.
similar terms
Calculation surcharge, surcharge
Related topics
Surcharge calculation, Calculation method
DS