Material

Description

Position evaluation material you receive an item-related comparison between the planned quantities from the preliminary cost estimate and the installed (posted) material quantities. The position evaluation is carried out for a construction site. Note that for a meaningful evaluation, the posting of materials in the daily report / delivery note entry or the supplier invoice entry must take place at item level (assignment to item).

Open within the Post calculation the menu Print and choose in the group Position evaluations the entry Material.

The following print menu opens.

Calculation example:

Service units 1.000, service unit m² = planned quantity 1.000 m² (item quantity 1.000), order quantity 800 m²

Name Feld BUSINESS Preliminary calculation Post calculation Soller Is
Service unit quantity Item quantity 1.000 * 1m² = 1.000m² 800m² 800m²
Unit of measure per service unit [ME / LE] Quantity approach, preliminary calculation 0,1m³ 0,1m³ 0,1875 (calculated)
(Material) quantity 1.000 * 0,1 m³ = 100 m³ (calculated) 150 m³ 80 m³ (calculated) 150 m³

Print settings

Make the following settings:

Variant

With the help of the designer you can design different print variants for each form. By clicking select the variant that you want to use for the printout.

Contact Person

The name of the logged in user is preset, which is saved in the Address manager was stored in the user data.

printer

By clicking choose the printer you want to use for printing. Only printers installed under Windows are available for selection.

Paper feed

If your printer offers several paper trays, select by clicking on the slot from which the paper is used for printing.

print from / to page

Here you can specify the pages to be printed out. If you have the entire list print please do not make any changes in this field.

Copies

If you need several copies of the list, enter the desired number here.

After you have made all the necessary information for your printout, click on in the Print Settings menu to see a print preview. Send the printout to the printer by clicking on or alternatively use the key combination Ctrl + P.

Settings tab

Activate the respective option by ticking the box .

Construction site

Select by clicking on the construction site for which you want to create the position evaluation material.

Alternatively, you can open a construction site using the tab construction sites Select. All construction sites with the LV status are in the project tree BA (Construction site, work not yet started) and BB (Construction site, work started) to choose from. Select the construction site or several construction sites for which you want the construction site result print want.

A quick search is available below the project tree to quickly find a construction site. To do this, enter in the field Keyword one or parts of a course number, a course description or a client name and start the search with Enter. A full text search is carried out by entering a space in front of the search term.

Quantities from

Here you specify whether the quantities from the order, the quantity approach or from quantity statements should be used for the comparison calculation of the preliminary costing prices.

All positions

All positions are taken into account. However, if you want to limit the selection, go to the tab positions and mark with which positions you want to consider.

Final sheet only print

A summary of the target / actual comparison is also printed out (material description, unit, target quantity, actual quantity, difference quantity).

Further steps