Delivery note list

Description

The Delivery note list prints all recorded delivery notes for a construction site. All or individual items or all or individual materials for the specified period are output.

Open within the Post calculation the menu Print and select the entry Delivery note list.

The following print menu opens.

Print settings

Make the following settings:

Variant

With the help of the designer you can design different print variants for each form. By clicking select the variant that you want to use for the printout.

Contact Person

The name of the logged in user is preset, which is saved in the Address manager was stored in the user data.

printer

By clicking choose the printer you want to use for printing. Only printers installed under Windows are available for selection.

Paper feed

If your printer offers several paper trays, select by clicking on the slot from which the paper is used for printing.

print from / to page Here you can specify the pages to be printed out. If you have the entire list print please do not make any changes in this field.

Copies

If you need several copies of the list, enter the desired number here.

After you have entered all the necessary information for your printout, click on in the Print Settings menu to see a print preview. Send the printout to the printer by clicking on or alternatively use the key combination Ctrl + P.

Settings tab

Activate the respective option by ticking the box .

Construction site

Select by clicking on the construction site for which you want to create the delivery note list.

Alternatively, you can open a construction site using the tab construction sites Select. All construction sites with the LV status are in the project tree BA (Construction site, work not yet started) and BB (Construction site, work started) to choose from. Select the construction site or several construction sites for which you want the construction site result print want.

A quick search is available below the project tree to quickly find a construction site. To do this, enter in the field Keyword one or parts of a course number, a course description or a client name and start the search with Enter. A full text search is carried out by entering a space in front of the search term.

Evaluation period from

Enter the required minimum date for the material postings to be taken into account for the post costing. All postings greater than or equal to the minimum date are used.

Evaluation period until

Enter the desired maximum date for the material postings to be taken into account for the final costing. All bookings less than or equal to the maximum date are used.

All positions, all materials

All positions and all materials are taken into account. However, if you want to limit the selection, call up the corresponding tab and mark with which items and materials you want to consider.

amount print

When selected, the delivery note list is printed out with the price for the material bookings.

Further steps