Proof of material

Description

The Proof of material prints a compilation of all recorded materials for a construction site. The entry date, the quantity and the material catalog are printed out. All or selected materials of the specified period are printed.

Application

Open within the Post calculation the menu Print and select the entry Proof of material.


The following print menu opens.

Print settings

Make the following settings:

Variant
For each form you can use the designer to create different Print variants shape. By clicking select the variant that you want to use for the printout.

Contact Person
The name of the logged in user is preset, which you can enter in Address manager in the user data.

output
By clicking choose whether to print or save the list as a Fax or e-mail want to send.

printer
By clicking select the printer you want to use for the printout. Only printers that are installed under Windows are available for selection.

Paper feed
If your printer offers several paper trays, select by clicking on the slot from which the paper is used for printing.

print from / to page
Here you can specify the pages to be printed out. If you want to print the entire list, please do not make any changes in this field.

Copies
If you need several copies of the list, enter the desired number here.

Settings tab

Activate the respective option by ticking the box

Construction site
All construction sites with the LV status are in the project tree BA (Construction site, work not yet started) and BB (Construction site, work started) to choose from. Select the construction site or several construction sites for which you want to print the construction site result.

A quick search is available below the project tree to quickly find a construction site. To do this, enter in the field Keyword one or parts of a course number, a course description or a client name and start the search with Enter. A full text search is carried out by entering a space in front of the search term.

Evaluation period from
Enter the desired minimum date for the material postings to be taken into account for the post costing. All postings greater than or equal to the minimum date are used.

Evaluation period until
Enter the desired maximum date for the material postings to be taken into account for the final costing. All bookings less than or equal to the maximum date are used.

All materials
All material postings of the selected construction site that lie within the evaluation period are taken into account. However, if you want to limit the selection, go to the tab Material and mark with what materials you want to consider.

Print preview and printing

After you have entered all the necessary information for your printout, click in the menu Print settings on to see a print preview. Send the printout to the printer by clicking on or alternatively use the key combination Ctrl + P.

Further steps